1. Our company's inspection is divided into incoming inspection (raw material inspection), process inspection (online inspection, QC inspection, sampling) and final inspection to ensure that our products meet the quality requirements. If any link fails, the next link will be terminated. After years of production, our company has formed a complete set of strict quality inspection process. As a result, customers are very satisfied with our products.
2. First inspection, in-process inspection, final inspection: the first inspection is during mass production, or change in material, mold, color, or processes. Production will only proceed after confirmation by the process inspector. Then, there is patrol inspection every four hours during mid-inspection and final inspection. If any defects are found, they will be promptly reported to the workshop operators or mechanics for adjustment.
3. Final valve inspection: all valves will have 100% seal test.