UDRN001
ERA
Size: | |
---|---|
Availability: | |
Quantity: | |
PVC DRAINAGE FITTINGS WITH GASKET(EN1401)
In civil buildings area, PVC drainage pipeline is widely used in above&under-ground water drainage system.
Excellent physical and chemical performance like: corrosion resistance, impact resistance, low fluid resistance, Convenient connection
For PVC drainage pipe production, we have 32 extrusion lines. The Annual capacity is 102,640 tons; For PVC drainage fittings production, we have 573 injection machines. The annual capacity is more than 46,600 tons. With the Sufficient capacity, era is able to complete large orders, So we will need lots of raw materials. As a result, we can bargain with our supplier and get lower price.
Besides,when big orders are producing, the machines keep running, making production cost much lower. In turn, the reduced cost will be shown on our price, and our customer can be more competitive in their markets.
As we use many rubber rings in our fittings, era has its own rubber ring factory and specially supply to ERA fittings. So we can effectively control the production, technology, quality and capacity,guarantee the product quality and delivery time from the source. We can process natural rubber, nitrile rubber, EPDM rubber and etc.,the largest size is up to 1.8 meters in diameter. The annual capacity could reach 2500 tons.
The production equipments of rubber ring are in a leading position in this industry.automatic rubber refining production line,injection rubber vulcanization machinedomestic high quality rubber production lines. Besides, we have complete inspection facilities, and strictly implement ISO standard. Which ensures the excellent quality of ERA rubber ring.
NSF certification.
After many-years experience accumulation of production, research and development, ERA has achieved the best production process standards.
The technology department will confirm the standard technology through trial production, after the first piece is inspected to be qualified by QC, the production procedure will be locked, workers have no right or access to do the adjustment, which ensures the stability of era products.
a. Incoming Quality control --------all the raw materials will be inspected in our labs to test all kinds of physical and chemical performance.
b. after raw material test to be qualified, we will start production.
c. First piece inspection--The first piece shall be inspected by producer, mechanic and quality inspection specialist. After it’s confirmed to qualified, then we could start the mass production.
d. Production process inspection--Process inspection shall be randomly conducted by process inspectors every four hours to supervise the quality of bulk order.
All the products are packed reasonably and carefully to achieve effective protection.
● We could package according to customer requirements
● Equipped with effective automatic packaging machine to deal with bulk orders to avoid delivery delay caused by labor shortage.
CNAS accredited lab and IAPMO accredited lab
Stat level enterprise research center
● Totally it covers over 6,000m²
● Equipped with over 300 sets of test equipment and over 250 researchers
● Total investment is about 20 million USD
ERA has invested $1.5 million to get 13 international certification, including American --NSF, UPC, Germany--DVGW, TUV,British--- WRAS and KITEMARK
Australian WATERMARK+ BET, France ACS, Russian GOST, SR - CU and EAC certification
Totally, covering 28 product series.
● VIP service
● 50-year warranty
● Credit sales support
● New product development
● Advertising support
PVC DRAINAGE FITTINGS WITH GASKET(EN1401)
In civil buildings area, PVC drainage pipeline is widely used in above&under-ground water drainage system.
Excellent physical and chemical performance like: corrosion resistance, impact resistance, low fluid resistance, Convenient connection
For PVC drainage pipe production, we have 32 extrusion lines. The Annual capacity is 102,640 tons; For PVC drainage fittings production, we have 573 injection machines. The annual capacity is more than 46,600 tons. With the Sufficient capacity, era is able to complete large orders, So we will need lots of raw materials. As a result, we can bargain with our supplier and get lower price.
Besides,when big orders are producing, the machines keep running, making production cost much lower. In turn, the reduced cost will be shown on our price, and our customer can be more competitive in their markets.
As we use many rubber rings in our fittings, era has its own rubber ring factory and specially supply to ERA fittings. So we can effectively control the production, technology, quality and capacity,guarantee the product quality and delivery time from the source. We can process natural rubber, nitrile rubber, EPDM rubber and etc.,the largest size is up to 1.8 meters in diameter. The annual capacity could reach 2500 tons.
The production equipments of rubber ring are in a leading position in this industry.automatic rubber refining production line,injection rubber vulcanization machinedomestic high quality rubber production lines. Besides, we have complete inspection facilities, and strictly implement ISO standard. Which ensures the excellent quality of ERA rubber ring.
NSF certification.
After many-years experience accumulation of production, research and development, ERA has achieved the best production process standards.
The technology department will confirm the standard technology through trial production, after the first piece is inspected to be qualified by QC, the production procedure will be locked, workers have no right or access to do the adjustment, which ensures the stability of era products.
a. Incoming Quality control --------all the raw materials will be inspected in our labs to test all kinds of physical and chemical performance.
b. after raw material test to be qualified, we will start production.
c. First piece inspection--The first piece shall be inspected by producer, mechanic and quality inspection specialist. After it’s confirmed to qualified, then we could start the mass production.
d. Production process inspection--Process inspection shall be randomly conducted by process inspectors every four hours to supervise the quality of bulk order.
All the products are packed reasonably and carefully to achieve effective protection.
● We could package according to customer requirements
● Equipped with effective automatic packaging machine to deal with bulk orders to avoid delivery delay caused by labor shortage.
CNAS accredited lab and IAPMO accredited lab
Stat level enterprise research center
● Totally it covers over 6,000m²
● Equipped with over 300 sets of test equipment and over 250 researchers
● Total investment is about 20 million USD
ERA has invested $1.5 million to get 13 international certification, including American --NSF, UPC, Germany--DVGW, TUV,British--- WRAS and KITEMARK
Australian WATERMARK+ BET, France ACS, Russian GOST, SR - CU and EAC certification
Totally, covering 28 product series.
● VIP service
● 50-year warranty
● Credit sales support
● New product development
● Advertising support
1. Relying on our state-level R&D center and strong research team, ERA has invested $1.5 million to get 13 international certification, including the American NSF and UPC certification, Germany DVGW and TUV certification, British WRAS and KITEMARK, Australian WATERMARK and BET certification, France ACS certification, Russian GOST, SR - CU certification and EAC certification, covering total 28 different category of product series.
2. With these certifications, ERA products have successfully entered many foreign markets and obtained the access to local municipal projects.At the same time, with the advantages of these certifications, our customers could occupy a favorable position in the market, and get better bargaining rights and quality guarantee, so as to achieve long-term development.
3. Our PVC DRAINAGE FITTINGS WITH GASKET 、products have obtained one international certification, British KITEMARK
4. British KITEMARK certification is known as the most difficult certification to be obtained in the world.The following table lists the tests that product needs to pass to obtain KITEMARK certification.
For the appearance, the fittings should be smooth, clean and free from defects for both internal and external surfaces .
Every one hour we should check 1 time during production.
Color, we should check according to orders requirement.
Dimension and tolerance, we should measure it according to relevant method, Every 4 hours, we should check 1 time during production.
Vicat temperature should be more than 79 ℃, Softening temperature test, The test piece is tested in oven under 150 for 30min, We will check the surface after that, the qualified piece should be without damage. Each batch will be tested.
Here I want to emphases the importance of vicat.
The climate in Africa and middle east is usually hot and dry, even in this situation, the shape of our products will remain the same because vicat temperature of our products is higher than 79,and basically no customer complaints about this.
1. Relying on our state-level R&D center and strong research team, ERA has invested $1.5 million to get 13 international certification, including the American NSF and UPC certification, Germany DVGW and TUV certification, British WRAS and KITEMARK, Australian WATERMARK and BET certification, France ACS certification, Russian GOST, SR - CU certification and EAC certification, covering total 28 different category of product series.
2. With these certifications, ERA products have successfully entered many foreign markets and obtained the access to local municipal projects.At the same time, with the advantages of these certifications, our customers could occupy a favorable position in the market, and get better bargaining rights and quality guarantee, so as to achieve long-term development.
3. Our PVC DRAINAGE FITTINGS WITH GASKET 、products have obtained one international certification, British KITEMARK
4. British KITEMARK certification is known as the most difficult certification to be obtained in the world.The following table lists the tests that product needs to pass to obtain KITEMARK certification.
For the appearance, the fittings should be smooth, clean and free from defects for both internal and external surfaces .
Every one hour we should check 1 time during production.
Color, we should check according to orders requirement.
Dimension and tolerance, we should measure it according to relevant method, Every 4 hours, we should check 1 time during production.
Vicat temperature should be more than 79 ℃, Softening temperature test, The test piece is tested in oven under 150 for 30min, We will check the surface after that, the qualified piece should be without damage. Each batch will be tested.
Here I want to emphases the importance of vicat.
The climate in Africa and middle east is usually hot and dry, even in this situation, the shape of our products will remain the same because vicat temperature of our products is higher than 79,and basically no customer complaints about this.